Patrick’s 29er went off to powder this morning. Ordered his fork and post along with a kit for another build previously in the build list. Was on the phone with Phil Wood, Paul Components, Quality Bicycle Components, AND Chris King. After all was said and done it was time to head out for a much needed gravel ride:
Came back and prepped everything for Monday’s start of Patrick’s Fat Bike. Here’s all the parts assembled and prepped for an early start to the bottom bracket assembly:
Yesterday when all was said and done I took out the fat bike to the top of Winn Mtn. and back to the shop.
Getting in the Spirit of the next build
Patrick’s 29er went off to powder this morning. Ordered his fork and post along with a kit for another build previously in the build list. Was on the phone with Phil Wood, Paul Components, Quality Bicycle Components, AND Chris King. After all was said and done it was time to head out for a much needed gravel ride:
Came back and prepped everything for Monday’s start of Patrick’s Fat Bike. Here’s all the parts assembled and prepped for an early start to the bottom bracket assembly:
Yesterday when all was said and done I took out the fat bike to the top of Winn Mtn. and back to the shop.