Lot’s going on over here in the studio. It’s been a while but you’ll really want to hear what’s going on. So this past summer I’ve decided to put time/effort into getting my shop ready here in New Hampshire. Some upgrades to our current service needed to be done so that the shop can get some high power juice. That involved HAND DIGGING a 160ft. trench. Uphill. Both ways. That’s finished, and all the 2″ pipe has been laid before the winter hit. The line and the rest of the electricals will be finished early spring 2011. Late spring early summer 2011 the shop will get a new floor poured and a full buildout will be in order. I hope to have the first 44 roll out the doors in June of 2011. Keep your fingers crossed!
As for the website, I’m currently putting the finishing touches on a beta site and testing it. So far so good on Internet Explorer 7+, Safari, Opera, Google Chrome and Firefox. I’ve also got an online shop in the works along with some free downloads. Warranty info, pricing and the fit forms are finished and uploaded to the server. Kind of handy being a designer actually-I can handle all of this and make it exactly how I want it…
I’m also going to be shifting everything over to a WordPress platform blog as well. I’ll preserve this blog with the new WP platform so not to worry. Stay tuned and feel free to email me directly to get on a mailing list for when this stuff starts to roll out: khenry@44bikes.com
UPDATE SEASON
Lot’s going on over here in the studio. It’s been a while but you’ll really want to hear what’s going on. So this past summer I’ve decided to put time/effort into getting my shop ready here in New Hampshire. Some upgrades to our current service needed to be done so that the shop can get some high power juice. That involved HAND DIGGING a 160ft. trench. Uphill. Both ways. That’s finished, and all the 2″ pipe has been laid before the winter hit. The line and the rest of the electricals will be finished early spring 2011. Late spring early summer 2011 the shop will get a new floor poured and a full buildout will be in order. I hope to have the first 44 roll out the doors in June of 2011. Keep your fingers crossed!
As for the website, I’m currently putting the finishing touches on a beta site and testing it. So far so good on Internet Explorer 7+, Safari, Opera, Google Chrome and Firefox. I’ve also got an online shop in the works along with some free downloads. Warranty info, pricing and the fit forms are finished and uploaded to the server. Kind of handy being a designer actually-I can handle all of this and make it exactly how I want it…
I’m also going to be shifting everything over to a WordPress platform blog as well. I’ll preserve this blog with the new WP platform so not to worry. Stay tuned and feel free to email me directly to get on a mailing list for when this stuff starts to roll out: khenry@44bikes.com
Follow along on my flickr feed for the latest rides, builds and happenings around the shop & studio.
As always-keep the rubber side down and the pedals turning.