Wow… Just look at those hunks of OSB. All lined up like good workers gettin’ the job done. So that’s off the list finally. Next up is run the line for power, set up the main breaker for the shop and do all the preliminary wiring for this side of the shop. Going to do it all in conduit so it has a nice “industrial” feel to it. Walls will be painted a nice buttery bright yellow. Going to use galvo steel for the ceiling. I’ve seen this used in other shops and my bud up north of me used it too in his. Really throws light well.
Making headway finally. Super stoked. Stay tuned for more stoke when power is run: Tooling will begin to be produced in earnest. Just in time for Framebuilding Season…
Shop Update: 6.20.2011 REDUX
Wow… Just look at those hunks of OSB. All lined up like good workers gettin’ the job done. So that’s off the list finally. Next up is run the line for power, set up the main breaker for the shop and do all the preliminary wiring for this side of the shop. Going to do it all in conduit so it has a nice “industrial” feel to it. Walls will be painted a nice buttery bright yellow. Going to use galvo steel for the ceiling. I’ve seen this used in other shops and my bud up north of me used it too in his. Really throws light well.
Making headway finally. Super stoked. Stay tuned for more stoke when power is run: Tooling will begin to be produced in earnest. Just in time for Framebuilding Season…